Add a Materials Grid to a PE Schedule Form
Unlike with tying asset materials to a PM schedule, there is only one set of steps for adding material lists to a PE schedule.
The Show X12-850 fields on Material Issue option must be disabled to generate PMs with materials. To disable this option, select Setup >Materials > Options, clear the Show X12-850 fields on Material Issue check box, and then select Save.
To add the Materials grid to a PE Schedule form, follow these steps:
-
Create a new PE Schedules form or open an existing form in the Form Designer.
-
Click the tab labeled New Tab.
-
In the Tab Name field, enter a name, for example, Materials.
-
Select a tab layout.
You can select the Full Tab Layout or a split type, if you want to add more grids/fields later.
-
In the Show in Mode area, select Edit Mode.
-
Click Add Tab.
-
Select the tab you just created.
-
Expand the Grids list in the elements pane.
-
Drag and drop the Selected Materials grid onto the tab.
-
Position the tab where you want it in the tab order.
-
Click Save to save your changes.
Users can now tie a list of necessary materials to a PE schedule and automatically generate material issues when a work order is generated from PEs created with this form.