Change Status of All Records in Group
-
Open the master work order for the group.
You can tell that the current work order is a master work order by looking at the Work Center header. The words Master Work Order will be displayed after the work order ID.
-
Ensure you are on the Details, Tasks, Costs, or Documents page.
-
Change the status in one of the following ways:
-
Open the Action menu next to the word Status in the upper-right of the page and select the desired status.
-
Click the button at the bottom of the page representing the desired status change.
The status for all members of the group is changed to the selected value. It is not necessary to save this change.
-